US March final Markit PMI services 55.3 vs 54.8 expected

March final Markit PMI

  • Preliminary reading was 54.8
  • Prior was 56.0
  • Composite index 54.6 vs 54.3 prelim
  • Prior composite index was 55.5
  • Employment 52.8 vs 52.8 prelim
This puts a positive bias into the ISM non-manufacturing report that’s due at the top of the hour.
Go to top